Award of the Best Innovation 2004
 
Award of the Best Price Value 2005


22.0 CNC Center Introduction

22.1 Location:

Taipei suburb approximate 15 km from headquarter (25 minutes by car)
Taipei center with 60 Prototype Engineers
China suburb approximate 10 minutes from factory, located at PPL Center
China center with 30 Prototype Engineers

22.2 Prototype Shop:

Able to service any 2D drawing/files to converse to 3D model
Service 3D model with CNC milling or SLA parts
3D File = 3 to 7 Days / 2D File = 7 to 12 Days
Service 3D CNC Injected Mold with In-house software / lead-time 30 to 50 Days
From one prototype mold, can produce 18 to 20 copy set with timeline:
- 1 to 3 pieces = 5 to 7 days
- 4 to 10 pieces = 7 to 12 days
- 4 to 18 pieces = 7 to 15 days

22.2 Prototype Shop:

X Y Z
A 800 500 500
B 800 450 500
C 1000 500 700
D 1400 700 700

22.4 Equipment Facilities:

CNC 6 Units in Taipei
PC Computer 50 Units
Vacuum Machine 2 Units
Milling Machine 4 Units
Grinding Machine 3 Units
Silicon Copy Machine 2 Units (For PU Material Prototype)

22.5 New Facility:
We have built up this facility at our new plant II, Prudent Group Ltd., A-1 Floor with 32 CAD/CAM employee as well CNC machines.


Copyright 2006-08. All Rights Reserved.


Award of the Quality performance 2002
 
Award of the Best Quality 2003